Curtain rod installation skills
1, the curtain box installation is to find a good position, draw the dimension line seriously, accurate installation of embedded parts. Before installation, the drawing line is correct. The installation scale must be consistent with the elevation, and the center line is accurate.
2. When the curtain box is installed, the length of the two ends should be the same.
3. To prevent the curtain rail from falling off, the general cover plate thickness should not be less than 15mm, the cover plate thinning the 15mm should use the machine screw to fix the curtain rails.
4, the processing wood drying is not good, after admission to store the tide, installation should be painted in time.